Difference between revisions of "Putney Plaza"

From Open Source Controls Wiki
Jump to navigation Jump to search
Line 6: Line 6:
* Recommission  
* Recommission  
* Remote dashboards
* Remote dashboards
== Existing Documentation ==
* Existing Wiki (DPS/Thermal Integration)
* Mechanical Equipment Schedule
Mechanical_Equipment_Schedule_-_Putney_Plaza_-_Construction_Issue_140707.pdf


== Measuring Boiler Outputs ==
== Measuring Boiler Outputs ==

Revision as of 12:33, 11 August 2022

To Do:

  • Investigate current state of heat pumps and CHP
  • Install heat meters and controls
  • Confirm current operation
  • Recommission
  • Remote dashboards

Existing Documentation

  • Existing Wiki (DPS/Thermal Integration)
  • Mechanical Equipment Schedule


Mechanical_Equipment_Schedule_-_Putney_Plaza_-_Construction_Issue_140707.pdf

Measuring Boiler Outputs

A Micronics Clamp-On Heat Meter has been temporarily installed onto boilers in order to confirm the peak outputs of each boiler.

U1000MKII_WM_Issue_1.1


Air Source Heat Pumps

An initial survey of the roof top heat pump systems has highlighted some significant problems.

  • No way to understand current operation, without any feed into a monitoring (SCADA) system.
  • No alarming
  • No performance monitoring
  • At least one of the main circulating pumps to the heat pumps has never been wired up, making operation of the heat pump impossible since installation.

Next Steps

  1. Obtain all relevant manufacturers instructions on heat pumps and fitted controls
  2. Upgrade controls with open control system and remote monitoring so that the heat pumps can be setup and controlled as required
  3. Recommission heat pumps using new system
  4. Monitor performance and setup alarm routes