Difference between revisions of "Putney Plaza"
Jump to navigation
Jump to search
Line 12: | Line 12: | ||
A Micronics Clamp-On Heat Meter has been temporarily installed onto boilers in order to confirm the peak outputs of each boiler. | A Micronics Clamp-On Heat Meter has been temporarily installed onto boilers in order to confirm the peak outputs of each boiler. | ||
{{#l:U1000MKII_WM_Issue_1.1.pdf}}<br> | |||
<gallery widths="330" heights="400"> | <gallery widths="330" heights="400"> |
Revision as of 11:52, 11 August 2022
To Do:
- Investigate current state of heat pumps and CHP
- Install heat meters and controls
- Confirm current operation
- Recommission
- Remote dashboards
Measuring Boiler Outputs
A Micronics Clamp-On Heat Meter has been temporarily installed onto boilers in order to confirm the peak outputs of each boiler.