Putney Plaza

From Open Source Controls Wiki
Revision as of 11:51, 11 August 2022 by Rhg (talk | contribs)
Jump to navigation Jump to search

To Do:

  • Investigate current state of heat pumps and CHP
  • Install heat meters and controls
  • Confirm current operation
  • Recommission
  • Remote dashboards

Measuring Boiler Outputs

A Micronics Clamp-On Heat Meter has been temporarily installed onto boilers in order to confirm the peak outputs of each boiler.


U1000MKII_WM_Issue_1.1.pdf